Giel Ave. Complete Home Renovation
This complete home renovation from top to bottom took roughly 3.5 months in a home on Giel Avenue in Lakewood, Ohio working around the clock to prepare for its sale.
The following gallery illustrates the overall scope of work involved during the initial phases of the renovation. The primary bathroom, kitchen, and rear addition were all gutted to the studs prior to all new electrical and plumbing drains and lines being installed. Furthermore, the original basement bathroom was completely removed, reframed, and replaced with new mechanicals, drywall, flooring, fixtures and finishes.
As you can see from several of the photos above, the original exterior rear wall of the home was removed and replaced with LVL beams as a means to double the size of the primary bathroom. The new layout would feature a very large step-in shower, freestanding tub, extra wide sink and toilet.
Primary bathroom prior to full renovation; original exterior rear wall removed; replaced with LVL beam
Large step-in 40” x 66” shower, 48” wide vanity, 57” freestanding tub (left), and toilet (right; not shown)